This control plane turns integration and handoff data into one buyer-readable surface: missing contract proof, delivery attestation drift, stale replay packets, escalation gaps, and the exact sequence needed before a checkpoint, audit, or incident review hardens.
Restore missing contract proof, close the delivery and replay packet gaps, repair stale escalation attestations, and stabilize ownership before the next handoff checkpoint.
Every lane stays tied to owner, integration, packet readiness, and the next concrete operator move.
This is real connector evidence routing and handoff posture proof, not generic middleware copy.